The metaphor of the mask suggests several readings and interpretations. Both intimate and open. The space of the double skin supports all the technical, environmental and social wealth that the institution contains and projects towards the city and the Cité des Arts du Cirque.
(From competitor's text)
(Unofficial automated translation)
The jury greatly appreciated the refined treatment of the broadcasting room and the atrium shelter. It recognizes the very thorough study of all the components of the project, both in terms of the code and the structure.
On the other hand, the internal organization proposes a framework that is too rigid for the School and accentuates the internal corridors: atmospheres other than the broadcasting room do not meet the School's expectations of meeting and exchange.
Technical Committee Report (July 9, 2001)
Program and Functionality:
-The cloister form makes the layout rigid and increases circulation distances.
-Functions are staggered along linear axes.
-Cafeteria location is well situated.
-Middle organizations are isolated from the entrance.
-The shape of the resource center makes accommodations difficult in addition to being isolated from the entrance.
-The storage areas are far from the circulation room.
-The organization does not facilitate the interrelationships expected in an art school.
Surface area
Concept: 8,050 m2 gross
A surplus of : 1 000 m2
net/gross ratio of : .64 is very efficient
Technical analysis:
-Well controlled wood structure.
-Simple construction except for the double glass/wood wall.
-The wood cladding makes the maintenance of the glass wall complex.
Environmental architecture:
-The integration of timber is an ecological and acoustic choice.
-The party of the double walls represents an energy expense.
-The mechanical principles listed are poorly integrated and not innovative.
-The choice of materials reflects an environmental concern and a control of the environmental approach.
-The envelope is compact and balanced between glazing and opaque walls, with the exception of the courtyard of the classroom block.
-The layout of the rooms promotes natural lighting and ventilation.
Urbanism:
The project meets the City's height requirements.
Cost/Estimation
Reported cost: $15,844,600
Estimated Cost: $14,902,600
The difference between the two estimates comes from the electrical section and the envelope (wood and glass).
(From jury report)
(Unofficial automated translation)
112 scanned / 7 viewable
- Presentation Panel
- Presentation Panel
- Presentation Panel
- Presentation Panel
- Presentation Panel Excerpt
- Presentation Panel Excerpt
- Presentation Panel Excerpt